Our Factory
Machining, assembly and run test under one roof.
This is where QTech extruders, tanks, haul-offs, cutters and complete pipe lines are made. Frames are welded, parts are machined and fitted, cabinets are wired and every machine runs before it is crated, all on one site, so you can follow your order from a bare frame to a loaded container.
- Visits arranged by Maggie
- Live video walkthroughs
- Progress photos during the build
- Run test before crating
NO.30 Lehong Road, Leyu Town
Zhangjiagang City, Jiangsu, about two hours from Shanghai.
Six Areas, One Site
Fabrication, machining, assembly, cabinet wiring, run test, packing.
18+ Years, CE, ISO 9001, SGS
Building extrusion machinery here since 2007.
Walk The Floor Before You Fly In
A tour in the order your own machine would take it: where the site is, the route across it, each work area, and how to come and see it for yourself.
The Site
Location and work areas
The Route
Eight stops per machine
Assembly Floor
Machines taking shape
Electrical Cabinets
Wired for your supply
Run Test Area
Running before release
Packing And Loading
Crates, film, container
Visit Us
In person or on video
FAQ
Location, visits, packing
Plan A Visit
Dates, visitors, machines
One Site, From Steel Frame To Sealed Crate
The factory stands on Lehong Road in Leyu Town, part of Zhangjiagang in Jiangsu province, about two hours from Shanghai. Everything a QTech machine needs before shipment happens on this site: frames are fabricated, parts are machined and fitted, machines are assembled and wired, then run and packed.
Keeping those steps together means a single visit shows your order at whatever stage it has reached, and the people who assembled it are the people who run it before it leaves.
AREA 01
Fabrication Bay
Steel sections are cut and welded into machine bases and frames.
AREA 02
Machining
Screws, barrels, gearbox and die parts. The processes are set out on Manufacturing Capability.
AREA 03
Assembly Hall
Extruders, tanks and downstream units are built up and, for full orders, joined into lines.
AREA 04
Cabinet Bench
Control cabinets are wired, labelled and programmed.
AREA 05
Test Positions
Finished machines and lines are powered up and run before release.
AREA 06
Packing And Staging
Crating, film wrapping and loading into the container.
The site is the setting; what matters to you is the route your own machine takes across it.
How A Machine Moves Across The Floor
Nothing goes to the floor until drawings, center height, connections and voltage are agreed with you. From then on every machine makes the same eight stops, and we send photos at the ones you care about.
-
01

Frame Fabrication
Steel sections are welded into the base, which is then machined flat so the center height comes out right.
-
02

Machining And Fitting
Screws, barrels, die parts and smaller components are machined, then fitted at the bench.
Machining detail -
03

Mechanical Assembly
Drive, gearbox, screw and barrel, tanks, tracks and cutting units are built onto their frames.
-
04

Cabinet Wiring
The control cabinet is built for the voltage, frequency and safety standard at your plant.
-
05

Programming And Hook-Up
PLC and touch screen are set up. For a full line, the machines are connected so they start, stop and hold speed together.
-
06

Run Test
The machine runs before release, with an agreed material where your scope includes one.
Inspection detail -
07

Packing
Wrapped, crated and marked, with its spare parts and documents packed alongside.
-
08

Loading
The container is loaded at our door, and you receive the loading photos.
Most of that route is spent on the assembly floor, so that is where the tour goes next.
Where Extruders, Tanks And Downstream Units Take Shape
The main hall is where a machine spends most of its build time. Every photo here was taken on that floor: single machines between stages, and groups of the same machine built side by side.
Fitted on this floor
- Screw and barrel, gearbox and motor on the extruder
- Heaters and thermocouples, zone by zone
- Vacuum lines, valves and spray nozzles on the tanks
- Tracks and pads on haul-offs, cutting units on cutters
- Center height and interfaces set to the drawing
How screws, barrels, gearboxes and dies are cut before they reach this hall is explained on Manufacturing Capability. Each machine also has its own page, starting with Extruders.
Steel and bearings are half a machine; the other half lives in the control cabinet.
Control Cabinets Wired For Your Supply
Each cabinet is built for the voltage, frequency and safety standard of the country where the machine will run. Breakers, drives and terminal rows go onto the back plate and are labelled, and the PLC and touch screen are programmed before the machine is first switched on.
Your Supply, Not Ours
Send the voltage and frequency at your plant and the standard your inspectors work to. The cabinet is wired for them from the start.
Parts Your Electrician Knows
Components come from internationally known brands, which keeps replacements within reach of a local distributor.
One Line, One Set Of Signals
When we build the whole line, start and stop, the speed link between extruder and haul-off, and alarms and interlocks are shared across the machines.
Once mechanics and wiring meet, the machine moves to a test position to prove it actually runs.
Machines Run Here Before They Run For You
Before release, each machine is powered up and run on our floor. When your scope includes a material test and conditions allow it, the machine runs with an agreed material and makes pipe, so you see it working under load rather than turning empty.
Three ways to watch your run
- On siteStand next to the machine in Zhangjiagang.
- Live videoFollow the run on a call from your office.
- Photos and videoReceive the footage once the run is done.
What is measured during the run, and how it is recorded for your team, is listed on our quality page.
Quality ControlA machine that has passed its run still has a sea voyage ahead, and packing decides how it arrives.
Crated, Wrapped And Loaded With Its Paperwork
Packing starts once the machine has passed its run. Large units are wrapped in film and strapped down inside the container; smaller units, tooling and spare parts travel in plywood crates. The packing list, manuals, electrical diagrams and spare parts list go with the shipment, and loading photos come to you as the container fills.
- Film wrap and ratchet straps
- Plywood crates for parts and tooling
- Marks on every package
- Spare parts packed with the machine
- Manuals and wiring diagrams
- Loading photos sent to you
Photos tell part of the story; standing beside the machine, or seeing it live on a call, tells the rest.
Come And See It, Or Let Us Bring The Floor To You
Buyers are welcome at the factory before they order, while their machine is being built, or for its run test. If the trip does not fit your calendar, a video call shows the same floor.
Visit In Person
The factory is in Zhangjiagang, Jiangsu, about two hours from Shanghai. Tell Maggie your dates and what you want to see, and she arranges the visit.
Address: NO.30 Lehong Road, Leyu Town, Zhangjiagang City, Jiangsu, China
Walk Through On Video
A live video walkthrough of the workshop, or of your own machine during its run test, with build photos sent at the key stages in between.
Hours: Mon to Fri 7am to 7pm, weekends 10am to 5pm
Helpful to tell us before a visit
- Preferred dates
- How many people are coming
- Machines or lines you want to see
- Whether you want to watch a run test
More about the company
Questions About The Factory
Where it is, what happens there, and how to see it. Anything not covered here, ask Maggie.
At NO.30 Lehong Road, Leyu Town, Zhangjiagang City, Jiangsu, China, about two hours from Shanghai.
Yes. Send Maggie your preferred dates and the machines you would like to see and she arranges it. A live video walkthrough is the alternative when travel is not practical.
Frame fabrication, machining, assembly, cabinet wiring, the run test and packing all take place here. Bought-in items such as motors, drives and electrical components come from branded suppliers. The machining side is described on the Manufacturing Capability page.
Yes. Photos come to you at the build stages you care about, and you can join a video call or come to the factory at any point, including the run test.
Yes, each machine is run on our floor before release. When the scope includes a material test and conditions allow it, it runs with an agreed material. The checklist and records are explained on the Quality Control page.
Large units are film wrapped and strapped down in the container, smaller parts and spares go into plywood crates, every package is marked, and the documents travel with the shipment. You receive photos as the container is loaded.
Yes. The cabinet is wired for the voltage, frequency and safety standard you give us, using components from brands such as Siemens, ABB, Schneider Electric, Omron and Delixi.
CE, ISO 9001 and SGS. Ask Maggie for copies with your quotation.
Plan Your Factory Visit With Maggie
Coming to Zhangjiagang, or prefer a video walkthrough first? Tell us when, who and what you want to see, and Maggie comes back within 24 hours to fix the details.
Maggie
Sales, QTech Machinery
Arranges every visitI will plan the day around what you want to see, whether that is a machine like yours on the floor, our cabinet bench, or your own order on its test position.
The factory is in Zhangjiagang, about two hours from Shanghai. If the trip does not suit you, I can set up a live video tour instead.
Maggie
Zhangjiagang Qinxiang Machinery Co., Ltd.
When Would You Like To Come?
Fields marked are required.