Views: 0 Author: Maggie Publish Time: 2025-01-20 Origin: Site
Client: Middle Eastern utilities contractor
Challenge: 40% under-capacity operation with 9% defect rate in pressure pipe production.
Solution: Deployed modular HDPE system featuring:
• Co-rotating extruder with AI-driven melt optimization
• Real-time ovality correction (≤1.5%)
• Closed-loop material recycling
Outcomes in 8 weeks:
210% throughput increase (3.2 → 6.7 tonnes/hr)
Defects reduced to 0.7%
95% material utilization rate
Certified to ASTM F714 standards
Client Voice: "Revolutionized our pipe quality while halving energy costs." – Operations Director
Qinxiang Machinery powers precision extrusion innovation.