bulk bag unloader
Qinxiang
Availability: | |
---|---|
Quantity: | |
1 | Installation and precautions |
1, lifting The equipment can be lifted as a whole, lifting should pay attention to the "upward" mark, shall not tilt, inverted, must be put lightly, shock-proof, to avoid collision. 2. Storage Attention should be paid to moisture, fire and ventilation. 3. Installation Indoor installation, there must be enough space around for operation and maintenance. Outdoor supports can be secured to the cement floor using embedded anchor screws or expansion bolts. The installation site should be as far away from vibration sources as possible. There shall not be any other force transmission channels between the internal and external supports except for soft connections. |
2 | Maintenance |
1, in order to ensure the normal and reliable work of the equipment, there is a special person responsible for regular maintenance and maintenance. 2, regularly check whether the fasteners in each connection part are loose and falling off. 3, often check the cylinder, solenoid valve and gas pipe connection is loose and leakage phenomenon, should be replaced in time if necessary. 4. When the equipment is shut down for a long time, the residual materials inside the equipment must be removed to prevent the accumulation of mildew and insects. 5, each shift should do the equipment working condition check and cleaning and other maintenance work. |
1 | Installation and precautions |
1, lifting The equipment can be lifted as a whole, lifting should pay attention to the "upward" mark, shall not tilt, inverted, must be put lightly, shock-proof, to avoid collision. 2. Storage Attention should be paid to moisture, fire and ventilation. 3. Installation Indoor installation, there must be enough space around for operation and maintenance. Outdoor supports can be secured to the cement floor using embedded anchor screws or expansion bolts. The installation site should be as far away from vibration sources as possible. There shall not be any other force transmission channels between the internal and external supports except for soft connections. |
2 | Maintenance |
1, in order to ensure the normal and reliable work of the equipment, there is a special person responsible for regular maintenance and maintenance. 2, regularly check whether the fasteners in each connection part are loose and falling off. 3, often check the cylinder, solenoid valve and gas pipe connection is loose and leakage phenomenon, should be replaced in time if necessary. 4. When the equipment is shut down for a long time, the residual materials inside the equipment must be removed to prevent the accumulation of mildew and insects. 5, each shift should do the equipment working condition check and cleaning and other maintenance work. |
content is empty!