Client: Southeast Asian water infrastructure supplier
Challenge: Aging equipment caused 15% material waste and slow output (5m/min).
Solution: Installed automated HDPE line with twin-screw extruder (±0.8°C control) and smart calibration.
Results in 60 days:
✅ 150% faster production (12.5m/min)
✅ Waste reduced to 3.2%
✅ Achieved ISO 4427 certification
✅ Enabled 30% recycled material use